Windhoist has started turbine installation at the 201.6MW Aftissat wind farm in Morocco.

The project, which will consist of 56 Siemens Gamesa 3.6-130 machines with 100-metre hub heights, is being developed for Société Energie Eolienne du Maroc.


The total cost of the project is $391m.

Aftissat is located 45km south of Boujdour in the Western Sahara.

Image: Windhoist/Said Neffati